Boscolo, M. (2009) Status of the SuperB project. Il nuovo cimento C, 32 (3\4). pp. 401-405. ISSN 1826-9885
|
Text
ncc9508.pdf - Published Version Download (207kB) | Preview |
Official URL: https://www.sif.it/riviste/sif/ncc/econtents/2009/...
Abstract
An international collaboration has been settled to study a highluminosity e+e− collider operating at the Υ(4S) that would deliver a luminosity of the order of 1036 cm−2 s−1. This collider, called SuperB Factory, would use a combination of linear and storage ring tecniques. Such a collider would produce an integrated luminosity of about 10 ab−1 in a running year at the Υ(4S) resonance. Further possibilities include having longitudinally polarized electrons at the interaction point and operating at the J/ψ beam energy.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Storage rings and colliders ; Beam optics |
Subjects: | 500 Scienze naturali e Matematica > 530 Fisica |
Depositing User: | Marina Spanti |
Date Deposited: | 26 Mar 2020 20:31 |
Last Modified: | 26 Mar 2020 20:31 |
URI: | http://eprints.bice.rm.cnr.it/id/eprint/16697 |
Actions (login required)
View Item |