Gramegna, F. and Prete, G. and Andrighetto, A. and Antonini, P. and Ballan, M. (2018) The SPES exotic beam ISOL facility: Status of the project, technical challenges, instrumentation, scientific program. Il nuovo cimento C, 41 (5). pp. 1-7. ISSN 1826-9885
|
Text
ncc11733.pdf - Published Version Download (1MB) | Preview |
Abstract
The SPES facility (Selective Production of Exotic Species), that is the INFN project for a Nuclear Physics facility with Radioactive Ion Beams (RIBs) is in advanced construction at the Legnaro National Laboratories. It will mostly provide neutron-rich exotic beams, through the production of fission fragments (1013 fiss/s) by an intense proton beam (200μA) on a direct UCx target. Several other targets will be developed, in order to provide users a large beam selection. Forefront research in nuclear structure and dynamics will be performed in the forthcoming years, studying a nuclear chart region far from stability. The expected beam intensities, their quality and their maximum available energies (up to 11MeV/n for A � 130) will provide the users with a modern and highly perfomant facility. Coordinated efforts are being dedicated to the developments and upgrading of both the accelerator complex and of up-to-date experimental set-ups.
Item Type: | Article |
---|---|
Subjects: | 500 Scienze naturali e Matematica > 530 Fisica |
Depositing User: | Marina Spanti |
Date Deposited: | 27 Nov 2020 09:32 |
Last Modified: | 27 Nov 2020 09:32 |
URI: | http://eprints.bice.rm.cnr.it/id/eprint/20330 |
Actions (login required)
View Item |